What are the types of construction stormwater BMPs?
Construction stormwater best management practices (BMPs) fall into five groups in EPA's 2022 CGP: erosion controls and stabilization that keep soil in place, sediment controls that catch soil once it moves, track-out controls at exits, pollution prevention for fuels, washout and wastes, and dewatering controls. Every BMP you use must be described in the SWPPP with its design, installation schedule and maintenance. EPA 2022 CGP Part 2.2, 2.3, 2.4, 7.2.6
National guide. The rules cited are from EPA's 2022 Construction General Permit (as modified in 2025), checked October 20, 2026, which applies where EPA is the permitting authority. Most states issue their own permit with different details; check your state before relying on a number.
Sources last checked October 19, 2026. Prepared by our team led by Mohamed Elansary, PhD, with AI research tools. We are not a licensed engineering firm and do not seal plans.
General information; your permit text controls. Not legal advice and not engineering judgment. We make no promise of permit coverage, agency acceptance or compliance.
BMP types with examples
| Type | Purpose | Examples named by EPA |
|---|---|---|
| Stabilization (erosion control) | Cover exposed soil so it does not erode | Seeding protected by erosion controls, sod, mulch, erosion control blankets, hydromulch, gravel. EPA 2022 CGP Part 2.2.14 |
| Cover for stockpiles | Protect soil piles from rain and wind | Tarps, blown straw, hydroseeding. EPA 2022 CGP Part 2.2.5, footnote 28 |
| Steep slope controls | Reduce erosion where steep slopes are disturbed | Preserved vegetation, hydraulic mulch, geotextiles and mats, compost blankets, earth dikes or swales, terraces, velocity dissipation devices. EPA 2022 CGP Part 2.2.7, footnote 29 |
| Perimeter controls (sediment control) | Trap sediment downslope of disturbed areas | Filter berms; silt fence, including wire-backed, super and multi-layer geotextile silt fence; compost filter socks; gravel barriers; temporary diversion dikes. EPA 2022 CGP Part 2.2.3, footnote 21 |
| Sediment barriers around stockpiles | Contain sediment at the base of piles | Berms, dikes, fiber rolls, silt fences, sandbags, gravel bags, straw bales. EPA 2022 CGP Part 2.2.5, footnote 27 |
| Inlet protection | Keep sediment out of storm drains that carry site runoff | Protection on each inlet you can reach, cleared of sediment by the end of the same business day where feasible. EPA 2022 CGP Part 2.2.10 |
| Velocity control | Slow water in channels and at outlets | Check dams, sediment traps and velocity dissipation devices. EPA 2022 CGP Part 2.2.11, footnote 33 |
| Sediment basins | Settle sediment from larger drainage areas | Basins sized for the 2-year, 24-hour storm or 3,600 cubic feet per acre drained. EPA 2022 CGP Part 2.2.12 |
| Track-out control | Keep soil off paved roads | Stabilized exits of aggregate stone over geotextile or non-woven filter fabric, turf mats; extra controls such as wheel washing, rumble strips and rattle plates. EPA 2022 CGP Part 2.2.4, footnotes 22, 24 |
| Pollution prevention | Stop non-sediment pollutants | Controls for fueling and maintenance, washing, building materials and wastes, washout of concrete, stucco and paint, fertilizers, and spill response. EPA 2022 CGP Part 2.3.1-2.3.6 |
| Dewatering controls | Treat pumped groundwater or stormwater | Routing water through a sediment control and preventing sheen and floating solids. EPA 2022 CGP Part 2.4 |
Rules that apply to every BMP
- Design for the site's rainfall, runoff and soils, and install following good engineering practices and the design specifications. EPA 2022 CGP Part 2.1.1-2.1.2
- Have downgradient sediment controls working before earth disturbance starts in that area. EPA 2022 CGP Part 2.1.3
- Keep every control in effective condition; finish routine maintenance by the close of the next business day, or within 7 days where documented as infeasible. EPA 2022 CGP Part 2.1.4
- Remove sediment from perimeter controls before it reaches half the above-ground height. EPA 2022 CGP Part 2.2.3
- Describe each control in the SWPPP with its design specifications, installation schedule and maintenance. EPA 2022 CGP Part 7.2.6
More on erosion and sediment control: erosion control plan requirements. Inspections of BMPs: SWPPP inspection requirements.
State BMP manuals
Most states that issue their own permit point to a state BMP or erosion control manual with specifications for each practice, and some require post-construction (permanent) stormwater controls. Check your state hub: Alaska, Arizona, Arkansas, Colorado, Florida, Hawaii, Idaho, Illinois, Indiana, Iowa, Kentucky, Louisiana, Massachusetts, Michigan, Mississippi, Nebraska, Nevada, New Hampshire, New York, North Dakota, Ohio, Oklahoma, Oregon, South Carolina, South Dakota, Texas, Utah, Washington, West Virginia.
SWPPP Desk does not take sites that need a sediment basin or BMPs that require engineering design; the checkout's site check stops those orders before payment.
What this page does not cover
Post-construction stormwater design, engineered BMPs, product selection and BMP installation. EPA's permit is summarized here; your state's permit and manual control where the state is the permitting authority.
Have it written for you
SWPPP Desk prepares site-specific SWPPPs from your drawings for construction sites in the states we cover (coverage by state), for a fixed price, delivered the next business day after your inputs are complete. Small site (1 to under 5 acres): $449. Large site (5 acres or more): $749. Background: all guides.
Related guides
- What is a SWP3?
- What is a SWPPP?
- SW3P, SWP3 and SWPPP: the same plan
- TCEQ SWPPP requirements
- TXR150000: the Texas construction general permit
- TCEQ stormwater permit for construction
- TCEQ NOI: filing in STEERS
- What goes in a SWPPP plan
- SWPPP template: EPA and state templates
- SWPPP inspection requirements
- SWPPP inspection form
- Erosion control plan requirements
- Who needs a SWPPP?
- Notice of Intent (NOI) for construction stormwater
- Notice of Termination (NOT)
- SWPPP sign and site notice
- SWPPP cost: our prices and public prices
- PROPOSED 2027 EPA CGP: what re-filing looks like
- TXR150000 renewal: the permit expires March 5, 2028
- Silt fence installation
- Sediment basin requirements
- Concrete washout rules
- Construction dewatering
- SWPPP site map requirements