Checked October 20, 2026 against the permit text published by Colorado Department of Public Health and Environment. Sources and sections are listed at the end of this page.
In Colorado, construction stormwater coverage comes from CDPS General Permit, Stormwater Discharges Associated with Construction Activity (permit no. COR400000), issued by Colorado Department of Public Health and Environment (CDPHE), Water Quality Control Division. It took effect April 1, 2024 and expires March 31, 2029.
At a glance
| Item | What the permit says |
|---|---|
| How coverage is obtained | Application in CEOS signed by owner AND operator; certification issued within 10 days (CDPHE page) |
| Agency fee | Annual fee under Regulation 61.15 (amount not listed in the permit) |
| Who may prepare the plan | No license or seal; plan is a Stormwater Management Plan (SWMP) naming a Qualified Stormwater Manager |
| Who inspects | Qualified Stormwater Manager; staff or a third party hired by the permittee (Part I.D) |
| Inspection frequency | Every 7 calendar days, or every 14 calendar days with post-storm inspections within 24 h after precipitation or snowmelt that causes surface erosion; every 7 days for Outstanding Waters; start within 7 days of commencement (Part I.D) |
| State forms and templates | CDPHE SWMP content checklist |
Points that are easy to miss
- Both owner and operator sign the CEOS application.
- Federal facilities in CO are under EPA (COR10F000).
- Reapply 90 days before March 31, 2029 expiry.
What a SWPPP Desk plan covers here
We prepare a site-specific plan written to COR400000, with each section mapped to the permit part it answers. You, the operator, review and sign it and keep it on site.
Checkout open in Colorado. State ruling: Sell. The site check on the plan page applies these conditions before payment. See coverage.
What we do not do
- Our plans are not sealed or stamped. BMPs that need design calculations, such as sediment basins and post-construction practices, come from your design professional.
- The operator signs the plan and is responsible for it.
- We do not visit or inspect sites.
- We do not file the NOI or any permit application for you. We tell you which form and portal the permit names.
Sources
- Permit text: oitco.hylandcloud.com (Cover (dates), Part I.A.3.j (expiration/continuation), Part I.C (SWMP), Part I.D (site inspections)). Checked 2026-10-20.
- Agency page: cdphe.colorado.gov. Checked 2026-10-20.
SWPPP Desk is not affiliated with Colorado Department of Public Health and Environment. If a rule here has changed, write to support@swpppdesk.com and we will correct this page.