What is a stormwater pollution prevention plan in Texas, and do you need one?

In Texas, a stormwater pollution prevention plan is called a SWP3. TCEQ's Construction General Permit (TXR150000) requires one for construction that disturbs one acre or more, or that is part of a larger common plan that will. The plan must be developed and put in place before construction begins. TCEQ

Last reviewed October 19, 2026. Prepared by Mohamed Elansary, PhD (Vertexium Environmental Solutions LLC).

The rules in brief

PermitTPDES Construction General Permit TXR150000, effective March 5, 2023, expiring March 5, 2028. TCEQ held a renewal stakeholder meeting on June 9, 2026. TCEQ CGP page
Under 1 acreNot regulated by the CGP unless part of a larger common plan of development or sale that will disturb 1 acre or more. TCEQ
Small siteDisturbs at least 1 but less than 5 acres (or part of a larger common plan in that range). TCEQ small sites
Large siteDisturbs 5 acres or more, or is part of a larger common plan that will disturb 5 acres or more. TCEQ
Site noticesForm 20961 (large, primary operator), 20962 (large, secondary operator), 20963 (small), 20964 (small, low potential for erosion). TCEQ forms list
FilingsNOI, Low Rainfall Erosivity Waiver, Notice of Termination and Notice of Change are filed online in STEERS unless you hold an electronic reporting waiver. TCEQ
NOI fee$225 when filed online through STEERS ($325 on paper). TCEQ assistance page TCEQ guidance
ScaleTCEQ reported 14,572 active Notices of Intent under the CGP as of October 2023. TCEQ 2023 seminar slides

Small sites (1 to under 5 acres)

Operators of small construction activities do not submit an NOI. To be covered they must develop a SWP3 and implement it before construction, post a signed Small Construction Site Notice (Form 20963) at least 2 days before work begins, keep it posted until final stabilization, and give a copy to the operator of any MS4 that receives the discharge at least 2 days before work. CGP Part II.E.2

Some small sites qualify for automatic authorization during periods of low potential for erosion (Form 20964) or for the Low Rainfall Erosivity Waiver; those paths have their own conditions. TCEQ small sites

Small site plan: $449

Large sites (5 acres or more)

The SWP3 must be developed and implemented before obtaining coverage and before construction. Primary operators submit an NOI electronically through STEERS before construction starts, then post the large construction site notice and leave it up until final stabilization and the Notice of Termination. CGP Part II.E.3 TCEQ large-site steps

Large site plan: $749

Data-center projects are on hold

TCEQ posted a notice that, at the Governor's direction, permit applications associated with data center projects, including construction projects seeking CGP coverage, are temporarily halted. We do not accept data-center projects while this is in place. TCEQ notice

Write it yourself or have it written

TCEQ publishes a free SWP3 template, RG-639. If you have the time, it is a solid place to start. If you would rather have a site-specific plan prepared from your drawings, SWPPP Desk writes it to the same section order for a fixed price.

Compare the two packages

Small siteLarge site
Disturbed area1 to under 5 acres5 acres or more, or part of a 5+ acre plan
Site-specific SWP3 + logsYesYes
Site noticeForm 20963 filled in for youForm 20961 or 20962 filled in for you
NOI helpNot neededNOI worksheet + step-by-step STEERS walkthrough (you file and pay TCEQ)
DeliveryNext business day after complete inputsNext business day after complete inputs
Price$449$749

Texas guides

General guides that apply in every state: all SWPPP guides.

City rules

What this page does not cover

This page covers the TCEQ Construction General Permit only. It does not cover city or county erosion control ordinances, MS4 local submittals beyond the site notice copy, industrial (MSGP) permits, oil and gas sites under Railroad Commission jurisdiction, or other states. It is general information, not legal advice; the permit text controls. Read TXR150000

Questions

Who signs the SWP3?

The operator signs. We prepare the plan and the signature pages; we do not sign for you and we do not stamp plans.

Do you file the NOI for me?

No. For large sites we give you a filled NOI worksheet and a STEERS walkthrough. You file it and pay the TCEQ fee.

Do you inspect my site?

No. We include the inspection logs and frequency options from the permit; your team or your inspector does the inspections.

What if my site turns out to be out of scope?

We screen every order before work. If your site needs engineered BMPs, a sediment basin, discharges to impaired waters, wetland or stream work, a locally required sealed plan, or is a data-center project, we refund you in full before any work. See the terms.