Home / Coverage

Coverage

Coverage by state

Who may prepare a construction SWPPP, state by state, and whether our checkout is open there. Checkout is open in 28 states: Alaska, Arizona, Arkansas, Colorado, Florida, Hawaii, Idaho, Illinois, Iowa, Kentucky, Louisiana, Massachusetts, Michigan, Mississippi, Nebraska, Nevada, New Hampshire, New York, North Dakota, Ohio, Oklahoma, Oregon, South Carolina, South Dakota, Texas, Utah, Washington and West Virginia. Some of those carry a limit you confirm before you pay.

State table checked 2026-10-20. Open: 18. Open with a limit: 10. Closed: 23. The checkout gate on each plan page applies this table before payment.

Ruling key. Sell = no state preparer licence found. Sell, limit = sell inside the stated limit only. Client PE = sell only with the client's licensed professional supplying the approved or sealed plan. Do not sell = state requires a credential we lack. Hold = not verified; do not sell until checked against the permit text.

Basis. F = primary text fetched and read. S = primary document found by search; text not fully read. Local rules apply everywhere (for example Houston SWQMP and Austin ESCP need a PE; Cook County MWRD in Illinois; Flat Rock, NC).

Our checkout is open only for Sell and Sell, limit rulings. Client PE, Do not sell and Hold states are closed.

StateRequirement foundSourceBasisRulingOur checkout
AlabamaCBMPP "prepared and certified by a QCP" (Ala. Admin. Code r. 335-6-12-.21). QCP = Alabama PE, CPESC, CDSEC and others.admincode.legislature.state.al.us ; adem.alabama.govFDo not sellClosed
AlaskaState DEC permit, not EPA (EPA only for Indian country and Denali, App. B). 2026 ACGP (eff. 2/1/2026 to 1/31/2031): SWPPP "developed by a qualified person." Table 4: over 20 acres, the preparer must be AK-CESCL certified (or CPESC and similar) and visit the site. 5 to under 20 acres: course recommended; the inspector must be AK-CESCL.dec.alaska.govFSell, limit: under 20 acres (client supplies AK-CESCL inspector at 5+ acres)Open with the limit shown. You confirm: If the site disturbs 5 acres or more, you will supply an AK-CESCL certified inspector.
Arizona"Qualified person"; no state credential.air.azdeq.gov (AZG2025-001, eff. 8/29/2025; copy at stormwater.mohave.gov)SSellOpen
ArkansasQualified personnel; no PE required. New permit effective 11/1/2026; re-check at launch.adeq.state.ar.usSSellOpen
CaliforniaSWPPP "developed by a QSD" (Order WQ 2022-0057-DWQ, V.A.2).www.waterboards.ca.govFDo not sellClosed
ColoradoQualified Stormwater Manager is self-attested; no licence.cdphe.colorado.gov (COR400000, eff. 4/1/2024 to 3/31/2029)SSellOpen
Connecticut5+ acres: plan prepared by a Qualified Professional, and for locally approved projects certified by a second QP or the district.portal.ct.govFDo not sellClosed
DelawarePlan "designed by a licensed professional" and approved; plans "sealed by a Licensed Professional in the State of Delaware" (CGP; 7 Del. Admin. Code 5101-3.0).documents.dnrec.delaware.gov ; www.law.cornell.eduFDo not sellClosed
District of ColumbiaESC plan designed by a DC-licensed PE, surveyor or architect (21 DCMR 542).dcrules.elaws.us ; doee.dc.govSDo not sellClosed
FloridaNo preparer licence found; qualified inspector rules (62-621.300(4)(a)).floridadep.govFSellOpen
GeorgiaPlan "prepared by a design professional" (licensed or CPESC) with GSWCC Level II certification, a site visit and a signed certification (GAR100001 Part IV).epd.georgia.govFDo not sellClosed
HawaiiDOH HAR 11-55 App. C: no preparer licence found in text. Honolulu: city plans need a Hawaii-licensed certified preparer (CWPPP/CESCPP).health.hawaii.gov ; www.honolulu.govFSell; Client PE on OahuOpen with the limit shown. You confirm: The site is not on Oahu, or, if it is, your Hawaii-licensed certified preparer supplies the City and County of Honolulu plans.
IdahoState IDEQ permit (IPDES IDR100000, eff. 2/10/2022 to 2/9/2027). EPA covers Indian country only (App. B). No preparer licence; inspectors need the EPA course or an equivalent certification (§6.3).www2.deq.idaho.govFSell (client inspector trained; re-check at 2027 reissue)Open with the limit shown. You confirm: You will supply an inspector trained under the permit (EPA construction inspector course or an equivalent certification, IDR100000 §6.3).
IllinoisSWPPP "prepared in accordance with good engineering practices"; no preparer licence. "Qualified personnel" (PE, CPESC, CESSWI, CSI, EPA CGP course and others) only for inspections (ILR10, eff. 9/22/2023 to 8/31/2028, Part IV). Scanned PDF; clo OCR'd it. Local: county stormwater ordinances (for example Cook County MWRD) may need PE-sealed plans; not verified.epa.illinois.govF (OCR)Sell (screen local ordinances)Open
County stormwater ordinances (for example Cook County MWRD) may need a PE-sealed plan. The site check asks about local seal rules, and any Yes or Not sure keeps checkout closed.
Indiana"Trained individuals" used for SWP3 design (CSGP, App. B).www.in.govFSell (document team training)Closed. Extra hold (state research, K 2026-10-20): not offered yet. Indiana's permit uses trained individuals for SWP3 design; we document our team's training first, pending K's confirmation.
IowaSWPPP "prepared in accordance with good engineering practices"; "qualified personnel" only for inspections; no preparer licence (General Permit No. 2, eff. 3/1/2023 to 2/29/2028).www.iowadnr.govFSellOpen
KansasSWPPP prepared under supervision of a Kansas PE, geologist, architect, landscape architect or CPESC (S-MCST-2208-1). PDF fetch failed.www.kdhe.ks.govSDo not sellClosed
KentuckySWPPP signed by the permittee per 401 KAR 5:060; no preparer licence or certification found (KYR10, eff. 1/3/2025 to 12/31/2029). Projects using treatment chemicals, or discharging to sediment-TMDL waters, are excluded from the general permit.eec.ky.govFSellOpen. You confirm: The project uses no stormwater treatment chemicals and does not discharge to a water with a sediment TMDL (both are excluded from KYR10).
LouisianaTwo permits: LAR200000 (1 to under 5 acres, eff. 8/25/2023 to 8/24/2028) and LAR100000 (5+ acres, eff. 10/1/2024 to 9/30/2029). SWPPP "prepared in accordance with good engineering practices"; "qualified personnel" only for inspections; no preparer licence.www.deq.louisiana.gov ; www.deq.louisiana.govFSellOpen
MaineSWPPP "prepared by a professional who has a valid Department certification in erosion control practices" (MCGP 2024).www.maine.govFDo not sellClosed
MarylandNOI not processed until the E&SC plan is approved by the approval authority (20-CP Part II).mde.maryland.govFClient PE (approved E&SC plan)Closed
MassachusettsEPA 2022 CGP: no preparer licence; "qualified person" for inspections (Part 4). MA wetlands-area stormwater standards excluded by our scope. CGP expires 2/16/2027.www.epa.govFSell (MA outside wetlands jurisdiction)Open. You confirm: The site is outside wetlands jurisdiction (no Wetlands Protection Act filing or wetlands-area stormwater standards).
MichiganPart 91: "A person shall prepare a soil erosion and sedimentation control plan" (Mich. Admin. Code R 323.1703); no preparer licence. Stormwater coverage is by rule (R 323.2190) once the local Part 91 agency issues the SESC permit. 5+ acres also file a Notice of Coverage. Inspections need a state-certified storm water operator (R 323.2190(2)(d)). County/municipal SESC agencies may add rules; not checked.www.law.cornell.edu ; www.michigan.govFSell (client gets the local Part 91 permit and supplies the certified storm water operator)Open with the limit shown. You confirm: You get the Part 91 soil erosion and sedimentation control permit from your local agency. You will supply the state-certified storm water operator for inspections.
MinnesotaEvery SWPPP preparer needs training under Permit §21.stormwater.pca.state.mn.usSDo not sell (until preparer trained; K decision)Closed
MississippiSound engineering practices; no preparer licence.www.mdeq.ms.govSSellOpen with the limit shown. Large site plan only
Extra hold (state research, K 2026-10-20): large sites (5 acres or more, MSR10) only. Small sites fall under MSR15, which we have not verified yet, so small Mississippi sites are not offered yet.
MissouriMORA00000 (eff. 2/8/2022 to 2/7/2027; reissue under way). The DNR page did not link the operative permit text, and clo did not read it.dnr.mo.govSHold (read the 2027 permit when issued)Closed. Under review: we read the 2027 Missouri permit when it is issued.
MontanaSWPPP Preparers "must obtain certification from a course approved by DEQ" (MTR100000).deq.mt.govFDo not sellClosed
NebraskaSWPPP "must be prepared by a qualified personnel," defined as a person knowledgeable in erosion and sediment control; no licence (NER210000, eff. 12/1/2021, expires 11/30/2026).dwee.nebraska.govFSell (re-check at reissue)Open
NevadaSWPPP "prepared and implemented in accordance with good engineering practices"; "qualified personnel" for inspections; no preparer licence (NVR100000, 2015 permit, administratively continued per NDEP).ndep.nv.gov ; ndep.nv.govFSell (re-check when reissued)Open
New HampshireEPA 2022 CGP: no preparer licence; "qualified person" for inspections (Part 4). MA wetlands-area stormwater standards excluded by our scope. CGP expires 2/16/2027.www.epa.govFSell (MA outside wetlands jurisdiction)Open with the limit shown. You confirm: The project disturbs no more than 100,000 sq ft (50,000 sq ft in protected shoreland), or, if it does, your New Hampshire professional engineer prepares the NHDES Alteration of Terrain permit application.
Condition (state research, K 2026-10-20): over 100,000 sq ft, or 50,000 sq ft in protected shoreland, needs an NHDES Alteration of Terrain permit sealed by a NH professional engineer; the buyer confirms this before checkout.
New JerseySPPP is built on the soil erosion plan certified by the Soil Conservation District; engineering items sealed. clo could not fetch the permit (bot block).dep.nj.govSDo not sellClosed
New MexicoEPA is the permitting authority (NMR100000, App. B). The state conditions in CGP Part 9.6.1 say SWPPPs "must be prepared... by qualified (e.g., CPESC certified, engineers with appropriate training) erosion control specialists" using soil-loss models, with preparer qualifications documented in the SWPPP.www.epa.gov ; www.epa.govFDo not sellClosed
New YorkA SWPPP with post-construction practices needs a "qualified professional"; NYC requires a PE or RLA. clo could not fetch the permit (bot block).dec.ny.govSSell, limit: E&SC-only plans outside NYCOpen with the limit shown. You confirm: The site is outside New York City. The plan needs no post-construction stormwater practices (erosion and sediment control only). You will supply the Qualified Inspector.
North CarolinaDEQ: no certification is needed to submit an E&SC plan; the plan must be approved before the NOI; local programs may be stricter.www.deq.nc.govFClient PE (approved E&SC plan)Closed
North DakotaNo preparer licence or certification found (NDR11, eff. 4/1/2025 to 3/31/2030).deq.nd.govFSellOpen
OhioNo state preparer credential (OHC000006).dam.assets.ohio.govSSellOpen
Oklahoma"SWP3s shall be prepared by a qualified person... Use of a licensed professional engineer (PE) for SWP3 preparation is not required by the permit," but any engineering parts need a PE (OKR10, eff. 10/18/2022, mod. 11/1/2023, Part II).oklahoma.govFSellOpen
Oregon20+ acres or NBZ option 2/3: ESCP developed and stamped by a CPESC, CPSWQ, Oregon PE, RLA or CEG (1200-C).www.oregon.govFSell, limit: under 20 acresOpen with the limit shown. You confirm: The site does not use natural buffer zone option 2 or 3. You will supply an inspector holding a Schedule B.1 credential.
PennsylvaniaE&S and PCSM plans prepared by a person "trained and experienced" (25 Pa. Code §§102.4(b)(3), 102.8); licensed professional oversight at critical stages; PCSM needs hydrologic design.www.pacodeandbulletin.gov ; www.pacodeandbulletin.govFClient PE (E&S and PCSM plans)Closed
Rhode IslandSESC plan "shall be stamped and signed" by a PE, CPESC, CPSWQ or RLA (RIR100000 2026, Part III.C).www.epa.govFDo not sellClosed
South CarolinaOver 2 acres: C-SWPPP prepared, certified and sealed by a PE, RLA or Tier B surveyor; 5+ acres under Reg. 72-400 needs a PE (SCR100000 §3.1.2).des.sc.govFSell, limit: 2 acres or less, no coastal-zone triggerOpen with the limit shown. You confirm: The site is not where the coastal-zone rule requires a licensed preparer.
South DakotaNo preparer licence or certification found. Sites inside a "qualified local program" follow that program (SDR100000, eff. 11/1/2023 to 10/31/2028, §6.1).danr.sd.govFSell (screen qualified local programs)Open. You confirm: If the site is inside a qualified local program, you will tell us, and that program's requirements apply.
TennesseeOver 5 acres: narrative by a PE/RLA, CPESC or TDEC Level II; structural or hydraulic designs sealed (TNR100000 §5.2). Permit face says it expires 9/30/2026; reissue status not confirmed.tnepsc.orgFSell, limit: 5 acres or less, after confirming current permitClosed. Checkout opens after we confirm Tennessee's current construction general permit (the permit face shows a 9/30/2026 expiry).
TexasNo state preparer licence in TXR150000. Local: Houston and Austin plans need a PE.www.tceq.texas.govSSell (screen Houston/Austin)Open. You confirm: If the site is in Houston or Austin, the city's own stormwater quality or erosion control plan needs a Texas Professional Engineer. We prepare the state TXR150000 SWP3 only.
UtahOver 5 acres, or 1 to 5 acres near perennial water or steep slopes: a "qualified" SWPPP writer (RSW, PE/PG, CPESC, CPSWQ, NICET 3) (UTRC00000 §7.2).www.utah.govFSell, limit: 1 to 5 acres, no triggersOpen with the limit shown. You confirm: The site is not within 50 feet of a perennial surface water and not on a steep slope as defined in the permit (Part 7.2).
VermontModerate risk: EPSC Plan "prepared by a certified engineer" (3-9020 §3.2). Low risk uses DEC's handbook site drawing, which is not our product.dec.vermont.govFDo not sellClosed
VirginiaSWPPP prepared before registration (9VAC25-880-50 C); ESC and SWM plans approved by the local VESMP authority; SWM plan design is gated.law.lis.virginia.govFClient PE (approved ESC/SWM plans)Closed
WashingtonCESCL must do inspections; no preparer licence found.ecology.wa.govFSell (client supplies CESCL)Open. You confirm: You will supply a Certified Erosion and Sediment Control Lead (CESCL) for the inspections.
West Virginia"Qualified Person"; PE seal only for the optional final stabilization certification.dep.wv.govSSellOpen
WisconsinNo preparer licence, but every regulated site needs an erosion control plan (§3.1) and a post-construction storm water management plan (§3.4, NR 151) with a technical basis. That second plan is design work (WI-S067831-6; dated to expire 9/30/2026, still the permit the DNR page cites).dnr.wisconsin.govFClient PE (storm water management plan)Closed. Not offered at checkout: Wisconsin needs your licensed professional's post-construction storm water management plan first. Waitlist only; write to support@swpppdesk.com.
WyomingTwo permits: small (1 to under 5 acres, no application) and large (5+ acres, NOI). DEQ page shows no preparer credential, but the permit text is kept in Google Drive folders and clo did not read it. Sage-grouse core-area projects need a Game and Fish letter.deq.wyoming.govSHold (read LCGP/SCGP text)Closed. Under review: we have not read the large and small construction permit text yet.