Checked October 20, 2026 against the permit text published by West Virginia Department of Environmental Protection. Sources and sections are listed at the end of this page.
In West Virginia, construction stormwater coverage comes from WV/NPDES General Permit, Stormwater Associated with Construction Activities (permit no. WV0115924), issued by West Virginia Department of Environmental Protection (WVDEP), Division of Water and Waste Management. It took effect April 6, 2024 and expires April 5, 2029.
At a glance
| Item | What the permit says |
|---|---|
| How coverage is obtained | Application through WVDEP's Electronic Submittal System (ESS), prepared by a Qualified Person, with the SWPPP, Groundwater Protection Plan and pre-, during- and post-construction drainage maps; site sign or public notice; discharge only after WVDEP authorization (Part II.A, II.E) |
| Agency fee | Application fee plus annual fees invoiced until the NOT is approved (Part III.D); amounts on WVDEP's fee schedule |
| Who may prepare the plan | SWPPP and application prepared by a 'Qualified Person' (Part II, II.H; definition 37: knowledge of erosion and sediment control, no licence); PE or surveyor certification is optional, only for final stabilization (Part IV.D.2) |
| Who inspects | Qualified Person (Parts II.G, III.B) |
| Inspection frequency | At least every 7 calendar days and within 24 h of 0.25 in rain or snowmelt runoff; every 4 days for Tier 2/Tier 3 or 303(d) waters (Part III.B.2) |
| State forms and templates | Application form includes the site sign template (Part II.A.1) |
Points that are easy to miss
- WVDEP reviews and approves the SWPPP with the application; work follows the approved plan (Part III.A).
- A Qualified Person must inspect newly installed controls before earth disturbance starts (Part II.G).
- Quarterly employee training must be logged in the SWPPP (Part II.H.3.b.7).
- Discharging while fees are unpaid counts as operating without a permit (Part III.D.2).
What a SWPPP Desk plan covers here
We prepare a site-specific plan written to WV0115924, with each section mapped to the permit part it answers. You, the operator, review and sign it and keep it on site.
Checkout open in West Virginia. State ruling: Sell. The site check on the plan page applies these conditions before payment. See coverage.
What we do not do
- Our plans are not sealed or stamped. BMPs that need design calculations, such as sediment basins and post-construction practices, come from your design professional.
- The operator signs the plan and is responsible for it.
- We do not visit or inspect sites.
- We do not file the NOI or any permit application for you. We tell you which form and portal the permit names.
Sources
- Permit text: apps.dep.wv.gov (Cover (dates), Part II.A (application), II.G, II.H (Qualified Person, SWPPP), III.B.2 (inspections), III.D (fees), IV.D.2, definition 37). Checked 2026-10-20.
- Agency page: dep.wv.gov. Checked 2026-10-20.