SWPPP requirements in Houston, Texas

Construction sites in Houston that disturb one acre or more need TCEQ Construction General Permit coverage and a SWP3. The City of Houston does not issue that permit, but it inspects covered sites inside city limits and requires a copy of your NOI or site notice before earth disturbance.

Last reviewed October 19, 2026. Prepared by our team led by Mohamed Elansary, PhD. We are not a licensed engineering firm and do not seal plans. Local rules change; confirm with the city before you start.

What we do and don't do in Houston. We still prepare the state SWP3 your site needs under TCEQ's TXR150000. The City of Houston's Storm Water Quality (SWQ) Permit is a separate city permit. It applies to new development on a tract of 1 acre or more, or to redevelopment of a 1-acre-plus tract that adds 0.2 acre or more of impervious cover. Its Storm Water Quality Management Plan (SWQMP) must be certified by a Texas Professional Engineer, so it is outside our scope. Your engineer prepares it and emails it to swq@houstontx.gov.

Official page: City of Houston: Storm Water Quality (SWQ) Permit

Local requirements in Houston

Scope flags for Houston

State rules that apply everywhere in Texas

Disturbed areaTCEQ classKey obligations
Under 1 acre, not part of a larger common plan of 1+ acresNot regulated by the CGPNo CGP coverage needed. TCEQ
1 to under 5 acres (or part of a common plan in that range)Small construction activitySWP3 before work; post Form 20963 at least 2 days before work; copy to MS4 operator 2 days before; no NOI. TXR150000 Part II.E.2
5 acres or more (or part of a 5+ acre common plan)Large construction activitySWP3 before coverage; primary operator files NOI in STEERS before work; post Form 20961 or 20962. TXR150000 Part II.E.3

Checklist for a Houston site

  1. Confirm acreage class (count support activities).
  2. Prepare and implement the SWP3 before soil disturbance. TXR150000 Part III.C
  3. Large sites: file the NOI in STEERS ($225 online). Small sites: sign Form 20963. TCEQ
  4. Send the NOI or site notice copy to the local MS4 contact above, on the local deadline.
  5. Post the site notice; keep the SWP3 on site; inspect on your chosen schedule. TXR150000 Part III.D, III.F.8
  6. At final stabilization, terminate and send the local copy. Keep records 3 years. TXR150000 Part VII

What this page does not cover

Building, grading or site development permits, drainage criteria, post-construction water quality permits (except where flagged above), and neighboring cities or county jurisdictions.

Have your Houston SWP3 written

Fixed price, delivered the next business day after your inputs are complete. Small site: $449. Large site: $749. Rules overview: Texas SWP3.